Several motorway closures will impact Essex traffic this weekend, according to National Highways England.
These will mainly be along the A12 in the early hours of the morning, with a few on the Dartford Crossing and the M25.
If you are set to be travelling along these roads, it's best to take note of different diversions in place.
Get more great stories like this delivered to your inbox every day by signing up to our morning newsletter - don't miss out!
Here’s a list of all of the closures from Friday, March 8 to Sunday, March 10.
M25, Dartford Crossing and A12 closures for Friday, March 8
A12
On the A12 Northbound way, there will be a carriageway closure between Junction 12 and 15 from 9pm until 5am for reconstruction/renewal works.
Also on the Northbound way, there will be exit slip road closures at Junction 14 and 15 between 5am and 9pm and a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Finally, on the Southbound way, there will be an exit slip road closure at Junction 13 for erection works between 8pm and 6am.
Dartford Crossing
The East tunnel on the Northbound way of the Dartford Crossing will be closed from 11pm to 5.30am for maintenance works.
M25
On the M25 clockwise way, there will be a carriageway closure between Junction 25 and 27 from 11am to 5.30am.
As part of the same roadworks, there will be entry slip road closures at Junction 25 and 26 during the same time.
M25, Dartford Crossing and A12 closures for Saturday, March 9
A12
On the A12 Northbound way, there will be exit slip road closures at Junctions 14 and 15 between 6am and 9pm for reconstruction/renewal works.
Meanwhile, also on the Northbound way, there will be a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Dartford Crossing
The West tunnel on the Northbound way of the Dartford Crossing will be closed from 10pm to 5am for maintenance works.
M25
On the M25 anti-clockwise way there will be an entry slip road closure at Junction 28 between 8pm and 5am.
Elsewhere, an entry slip road closure will take place at Junction 25 between 10pm and 6am, also on the anti-clockwise way.
Recommended reading:
- Van drove on wrong side of road before fatal crash on M25
- Drink and drug-driver caught on Dartford Crossing while she was already disqualified
- Pictures show what A12 will look like after £1.3billion widening project
M25, Dartford Crossing and A12 closures for Sunday, March 10
A12
On the A12 Northbound way, there will be exit slip road closures at Junctions 14 and 15 between 5am and 9pm for reconstruction/renewal works.
Meanwhile, also on the Northbound way, there will be a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Dartford Crossing
The East tunnel on the Northbound way of the Dartford Crossing will be closed from 10pm to 5am for maintenance works.
M25
No closures are listed on the Essex M25 junctions on this day.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here